SL260 BT CAVES INDUSTRIAL PARK 5 (BARAT)
Rapid KL Bus · Open in maps
Routes at this stop
Next departures (as of 4:28 PM Malaysia time)
| Time | Route | Towards | In |
|---|---|---|---|
| 16:43 ~ | 171 | HAB WIRA DAMAI | 15 min |
| 17:13 ~ | 171 | HAB WIRA DAMAI | 45 min |
| 17:43 ~ | 171 | HAB WIRA DAMAI | 1 h 15 min |
| 18:13 ~ | 171 | HAB WIRA DAMAI | 1 h 45 min |
| 18:43 ~ | 171 | HAB WIRA DAMAI | 2 h 15 min |
| 19:38 ~ | 171 | HAB WIRA DAMAI | 3 h 10 min |
| 20:43 ~ | 171 | HAB WIRA DAMAI | 4 h 15 min |
| 21:38 ~ | 171 | HAB WIRA DAMAI | 5 h 10 min |
| 22:29 ~ | 171 | HAB WIRA DAMAI | 6 h 1 min |
| 23:24 ~ | 171 | HAB WIRA DAMAI | 6 h 56 min |
| 00:09 ~ | 171 | HAB WIRA DAMAI | 7 h 41 min |
Scheduled times. Services marked ~ run at a frequency rather than to a fixed timetable.